Lansing Community College Gannon Building

Lansing, Mid Michigan

  • Customer: Granger Construction
  • Delivery Method: Design Build
  • Service Offering: Plumbing
  • Project Description: During construction, Limbach was tasked with facilitating the connections between the existing building with the new addition. The atrium air curtain system was coordinated to fit within the structural steel design; and lower level exhaust systems were re-routed by Limbach to fit the architectural space requirements. Additional value was added when Limbach helped to redesign the underfloor passive cooling and heating concept and ultimately making the building more energy efficient.
  • Completion Date: 2014
  • Total Project Cost: N/A