CASE STUDY:
Diaper Manufacturing Facility – High-Capacity Air Handling System
PROJECT NAME.
Diaper Manufacturing Facility – High-Capacity Air Handling System
CUSTOMER.
First Quality
MARKET SECTOR.
Industrial & Manufacturing
SERVICES
Turnkey Design-Build
Design & Engineering
Equipment Fabrication & Installation
OVERVIEW.
Leading diaper manufacturer with multiple East Coast facilities requiring precise humidity and temperature control to maintain product integrity.
SOLUTION DELIVERED
- Designed, manufactured, and installed ten (10) 129,000 CFM ClimaCell© units
- Each unit configured with dual vane axial fans serving independent production zones
WHY CLIMACELL©
- Delivers high airflow capacity (~65,000 CFM per fan / 129,000 CFM per unit)
- Maintains strict environmental conditions: 72°F / 42% RH
- Removes SAP particulate via integrated spray system, reducing clogging and maintenance
- Combined with drum and HEPA filtration for reliable, continuous operation