• LMB
    • Careers

CASE STUDY:
Diaper Manufacturing Facility – High-Capacity Air Handling System

PROJECT NAME.

Diaper Manufacturing Facility – High-Capacity Air Handling System

CUSTOMER.

First Quality

MARKET SECTOR.

Industrial & Manufacturing

SERVICES

Turnkey Design-Build
Design & Engineering
Equipment Fabrication & Installation

OVERVIEW.

Leading diaper manufacturer with multiple East Coast facilities requiring precise humidity and temperature control to maintain product integrity.

SOLUTION DELIVERED

  • Designed, manufactured, and installed ten (10) 129,000 CFM ClimaCell© units
  • Each unit configured with dual vane axial fans serving independent production zones

WHY CLIMACELL©

  • Delivers high airflow capacity (~65,000 CFM per fan / 129,000 CFM per unit)
  • Maintains strict environmental conditions: 72°F / 42% RH
  • Removes SAP particulate via integrated spray system, reducing clogging and maintenance
  • Combined with drum and HEPA filtration for reliable, continuous operation