• LMB
    • Careers

CASE STUDY:
Wet Chop Fiberglass Facility – Process Cooling & Air Washer System

PROJECT NAME.

Wet Chop Fiberglass Facility – Process Cooling & Air Washer System

CUSTOMER.

IKO – Wet Chop Fiberglass Manufacturing Facility

MARKET SECTOR.

Industrial & Manufacturing 

SERVICES

  • Turnkey Design-Build
  • Design & Engineering
  • Equipment Fabrication & Installation

OVERVIEW.

Wet chop fiberglass manufacturing facility requiring a quench and air conditioning system to support molten glass extrusion.

SOLUTION DELIVERED

  • Engineered a roof-mounted penthouse system housing six (6) air washers
  • Integrated filtration, exhaust, and air blending into a unified system
  • Blow-through configuration delivering 55°F supply air at ~90% saturation

WHY ClimaCell©

  • Effectively manages binder discharge that fouls traditional coil-based systems
  • Sustains performance while minimizing fouling, maintenance, and fan imbalance
  • High-capacity design with inherent redundancy and long-term durability