THE CHALLENGE.
Taking off-site prefabrication further than ever before to improve quality, onsite safety, and project schedule.
THE SOLUTION.
All horizontal domestic and heating piping was prefabricated off-site which eliminated more than 40% of the field labor installation hours
- 3,000 linear ft of prefabricated racks
- Full 9 stories mechanical shaft piping installed in 1 day
- Prefabrication reduced manpower on-site by 20 people
- Benefits also include trimming an anticipated 2 months off the schedule which saved the owner 5.6M