Restoring an Existing Air Handler to Increase Redundancy & Air Flow
https://www.limbachinc.com/wp-content/uploads/2024/02/IMG_2966-scaled.jpg
2560
1920
Limbach | A building systems solution firm for mechanical, electrical and plumbing building systems
https://www.limbachinc.com/wp-content/uploads/2024/02/IMG_2966-scaled.jpg
Air Handler Replacement Case Study: Restoring Mission-Critical Infrastructure Ensuring the reliability and efficiency of mission-critical infrastructure is paramount when maintaining operations in industrial environments. This was the challenge faced by a prominent industrial client in Detroit, Michigan, when they encountered performance issues with their refrigeration air handling unit (AHU). Critical System Repairs: Timely Intervention for…
read more